Text Placeholder Generator
Generate filler text to an exact character or word budget.
Find dates in any format and normalise them to one.
| As written | Normalised | Note |
|---|
The Date Extractor finds dates in every format a document might use and normalises them to one. The day-first or month-first ambiguity is resolved by a setting rather than a guess, and genuinely ambiguous dates are flagged rather than silently resolved.
Dates are the most inconsistently written data there is. 03/09/2026 means the third of September in Britain and the ninth of March in America. The same document can contain "3 Sept 2026", "September 3rd", "2026-09-03" and "Sep 3, 26", all meaning the same day.
This finds every date in a text, whatever format it was written in, and normalises them to one consistent form. The day-first or month-first ambiguity is resolved by a setting rather than a guess, because guessing is how date bugs happen — and any date that is genuinely ambiguous is flagged rather than silently resolved. Results can be output as ISO 8601, which is the only format that sorts correctly as text.
03/09 could be either reading, so the tool marks it rather than quietly picking one.
Numeric with any separator, written months, ordinals, ISO 8601 and two-digit years.
The only format that is unambiguous everywhere and sorts correctly as plain text.
A time attached to a date is preserved; a standalone time is reported separately.
What was written and what it became, so the normalisation can be checked.
A document, an export, a log or a set of records.
Day-first or month-first, which decides how 03/09 is read.
ISO 8601, a written form, or your own pattern.
Any date that could be read two ways is marked rather than silently resolved.
By the setting you choose, and it flags the result as ambiguous. Day-first reads it as 3 September; month-first as 9 March. There is no way to tell from the text alone, which is why the tool asks rather than guesses.
Numeric dates with slashes, hyphens and full stops; written months in full and abbreviated; ordinal days such as 3rd; ISO 8601; and two-digit years, which are interpreted with the standard 50-year window.
Because it is unambiguous and sorts correctly as plain text. 2026-09-03 always means the same day everywhere, and a column of ISO dates sorts chronologically without being parsed first.
Times attached to a date are recognised and kept. A standalone time with no date is reported separately, since it is usually not what someone extracting dates is after.
What people who use the Date Extractor think of it. Reviews come from visitors and are posted as written.
No ratings yet
Yours would be the first.
0 reviews
Newest first
No reviews yet
Be the first to rate the Date Extractor. It takes half a minute and no account.
Write the first reviewGenerate filler text to an exact character or word budget.
Sort a list into reverse alphabetical order.
Strip extra spaces, tabs, blank lines and invisible characters.
Pull every number out of a text and total them.
Count consonants in any text and see which letters dominate.
Look up definitions for common English words, offline.
Count every punctuation mark and see how a text is paced.
Convert text into hexadecimal bytes.